Parts from any process — CNC, injection molded, sheet metal, extruded, off-the-shelf hardware — fastened, wired, tested and kitted into one finished unit. One engineer owns the whole assembly, not just the part they happened to make.
Quick definition
Assembly and kitting takes individually manufactured parts — machined, molded, formed, whatever process made them — and combines them into a finished, tested, sellable unit. That can mean fastening a bracket to a housing, wiring a switch into an enclosure, or packing a hardware kit with the right screws and instructions. The output is one line item you can ship or sell, not a box of parts someone else has to put together.


Quoted as a product, not as parts
Upload a BOM to a manufacturing marketplace and each line gets its own price, its own vendor and its own lead time — the coupled tolerances between mating parts, the commercial hardware, the finishes that have to match and the delivery that has to land together stay your problem. Send the same BOM to OperGo and one engineer quotes, builds and tests it as one product. That's the difference between a supplier you prototype with and a partner you hand the production run to.
What's included
Fastening, pressing, bonding and mechanical joining of parts from any process into one build.
Wiring, switches, connectors and simple electromechanical integration built into the mechanical assembly.
Each assembly tested against its actual function before it ships — not just inspected for looks.
Fasteners, hardware and consumables sourced and packed with the assembly — one kit, not a shopping list.
How much do you need?
Individual parts are priced and shipped on their own. Assembly goes further: fit, fasteners and function are checked across the whole build, not just within one part.
Assembly builds and tests the product itself. Packaging is what happens after — the box, the label, the manual it ships in. Most orders need both, specified together.
Send the BOM and an engineer specs the assembly — what gets built, tested and kitted together, and what ships as separate parts.
Assembly means the parts are actually put together — fastened, wired, joined — into a finished unit. Kitting can mean that, or it can mean something lighter: packing the right parts, fasteners and instructions together without joining them, when the end customer assembles it themselves. Your engineer specs which one your product actually needs.
Yes — that's the default, not an exception. A CNC bracket, an injection-molded housing, a sheet-metal panel and off-the-shelf hardware are routinely built into one assembly under the same quote.
You see the per-part breakdown, but the quote is for the finished, tested unit: mating tolerances checked against each other, commercial hardware included, finishes matched across processes, and everything converging on one delivery date. One price and one lead time for the product — not a stack of part prices you have to reconcile yourself.
Assemblies are functionally tested against what they're actually supposed to do — not just visually inspected. What 'functional' means is specified with your engineer at quoting, since it depends entirely on the product.
We can source and kit fasteners, inserts and other hardware as part of the same order — one kit, not a separate shopping list you manage yourself.
That's exactly what checking stack-up across the whole build before production is meant to catch — if two parts from different processes won't fit together as drawn, it gets flagged and corrected before tooling or a production run is committed, not discovered on a bench after everything ships.
No, though they're often ordered together. Assembly builds and tests the product itself; packaging (the box, insert, label and manual) is what it ships in. Your engineer can spec either or both under the same quote.
That's fine — not every product needs joining. Tell your engineer what the end customer actually has to do with the parts, and the assembly and kitting level gets sized to that, not oversold.
What builds the product versus what it ships in — usually both, specified together.
A wall bike rack laser-cut, painted, bagged, boxed and palletized — assembly and kitting run as one line.
The system half: parts, variants and quantities saved as one orderable assembly code.
Ready? Go.
Send one part or your whole BOM. An engineer reviews it with the shop floor and sends back a real price, a real lead time and free DFM notes.
Get my quote →Free account, no commitment · NDA signed before you upload.